OPINION: Singapore Changi’s decision to close budget terminal could backfire as need for third runway grows

Centre For Aviaton, 7 Mar 2012
Singapore Changi Airport has taken the unusual decision to demolish its relatively new low-cost carrier terminal and build a larger hybrid terminal in its place. The closure of Changi’s Budget Terminal in Sep-2012 will result in the airport’s total handling capability shrinking by 10% during what could prove to be a challenging four-year period before the new hybrid Terminal 4 opens. Singapore also faces a pressing need to decide on the opening of Changi’s third runway, which is now only available to military aircraft, if it wants to stay ahead of the growth curve. Growing LCC operations have seen aircraft movements grow higher than passenger numbers. Full story